Skip to main content.

Phase 1B of the Blackwall Reach wider regeneration scheme delivers approx 242 homes.

Future tenants will be Private/Social and shared ownership.

They will be accommodated in three buildings, around a new public square next to the Blackwall DLR station which will re-establish the way the site connects to surrounding areas.

There will be two 10 storey buildings and a 24 storey tower with new shops and cafes at ground floor level around the new square.

 

Products
Futura+i Tilt and Turn and fixed to External facades.
Futura+ Fixed, Terrace Door and Low threshold Sliding door to internal winter gardens.

 

Client:
Swan Housing

Contractor:
Hill Partnerships

Architect:
Original: Karakusevic Carson
Latest: BPTW